Develop A Plan

Through the use of experts, public debate, committee involvement, and the collaboration between the board of directors and the GM I hope to help develop a fully comprehensive and forward thinking plan that will better align BVS with its current and future needs setting us up for success.. 

Any plan should be prepared by the best available, licensed experts, with direct knowledge and experience in the areas involved.  The plan should be designed to include a full assessment of what the CSD controls.  It should outline options, timeframes, and remedies as they relate to our current situation and future needs.  

As everyone knows, everything costs money.  A comprehensive plan should also include a researched financial plan prepared by experts, in conjunction with, the details set forth as mentioned above.  The public needs to know the truth.

Things I would like to see addressed regarding planning (not limited to these items or presented in any specific order).

  1. Analysis for efficiencies in all areas
  2. Water Resources –
    • Wells and purchased water
  3. Water Storage
  4. Water Distribution System
    • Pumps
    • Pipes
    • Regulators
    • Backflow
    • Valves
    • Hydrants
    • Pressure/Volume
  5. Sewer operations
  6. Drainage and Retention
    • Coordinate with Pipes and Roads
  7. Roads
    • Road drainage
    • Current Conditions
    • Coordinate with water line repairs
    • Positioning of pipes (side of the road?)
    • Any grading changes needed
    • Base materials and weight ratings
    • Longevity and Maintenance Plan      
    • Any snow related items that can be improved
    • Any recommendation for wildlife safety
    • Driveways
    • Better marked safety routes
  8. Gate and Entrance 
    • Complete R&R ???
    • A more updated and welcoming look and design
    • LED signage for keeping the community informed
    • Update techniques and technology as needed
    • Better flow of traffic (especially in an emergency)
    • Alternatives to broken gates.
  9. BVPD
    • Alternatives should be included.  
    • I am NOT suggesting we get rid of the PD nor would I. 
    • My hope would be that an independent source could gather the info so the public can put this divisive topic to rest.  
  10. Egress
    • Emergency Exits
    • Emergency Roads
    • Emergency Routes
    • Emergency Plans
    • Methods to keep the public informed?
  11. Safety
    • Fire Safety & Plans
    • EQ Safety & Plans
    • Flood Safety and Plans
  12. Fully comprehensive timeline and a breakdown on costs.

Financial concerns:

  1. Affordability to the community
  2. Cost Increases
  3. Opportunities for cost savings and reductions without loss of services
  4. Areas where there are opportunities to increase our revenue
  5. How can we pay for all of this with the least amount of impact to the wallet?

I have just shared with you a basic outline (draft) of what I feel is needed in regards to our infrastructure.  It is only an outline and a rough draft but it demonstrates the depth of information needed.